GranulesGranule Loss
Bald patches where granules have washed into the gutters expose the asphalt mat. Light loss can be coated; exposed mat needs repair first.
We coat commercial asphalt shingle roofs in Henderson when the shingles are flat, firmly attached, and covered by a coating approved for shingles.

Shingle coating has a narrow gate. Roofs that land in the right column are usually better off with a re-roof.
Four conditions decide most shingle coating calls. We look at each one before talking about products.
GranulesBald patches where granules have washed into the gutters expose the asphalt mat. Light loss can be coated; exposed mat needs repair first.
TabsTabs that curl at the corners or lift in wind break the flat surface a coating needs. Curling across a whole slope usually means a re-roof.
InsideWater marks inside can point to failed flashing or a soft deck. We trace the source and check the decking before any coating plan.
JointsChurches and offices often join a shingle roof to a metal addition. That wall or valley joint is a common leak and gets fabric and coating.
A shingle building often has more than one roof type. This is how we handle each part of a typical commercial shingle property.
| Roof Area | First Check | Likely Path |
|---|---|---|
| Shingle main roof | Curling, granule loss, soft decking | Shingle coating or re-roof |
| Metal addition | Screws, end laps, rust | Metal roof coating |
| Joint between them | Flashing at the wall | Fabric and coating detail |
| Low-slope porch or canopy | Ponding and drains | Silicone if the deck is dry |
When the shingles pass inspection, a coating buys them more service. These are the gains owners weigh against a re-roof.

A coating approved for shingles seals the surface and holds loose granules in place on a roof that is still flat and attached. The building keeps its current roof instead of going through a tear-off now.
Old shingles stay on the deck, which keeps a full load of asphalt debris out of the dumpster and off the property.
Churches, offices, and stores stay open while crews work on the roof above, with entrances and parking planned around ladders and pails.
A shingle main roof and its metal addition can be coated in the same mobilization, which keeps the joint detail consistent.
Granules in the gutters mean the shingles are wearing. Schedule an inspection to find out whether coating or a re-roof makes more sense.
Schedule Free InspectionShingle work starts with a strict inspection. The roof moves to the next stage only after it passes.
We check shingle attachment, curling, granule loss, flashing, and the decking underfoot, then review the space under the deck for moisture and ventilation. A failed check ends in a re-roof recommendation instead of a coating plan.

The coating maker has to approve its product over asphalt shingles. We also review the shingle manufacturer’s terms with you, since a coating can affect them.

Loose tabs get secured, failed flashing is redone, and joints where shingles meet metal or walls get fabric. Debris and loose granules are cleaned off before coating.

Approved coating goes on the shingles at the specified rate, and any metal addition is coated in the same visit. A final walk checks coverage at valleys, edges, and the joint.

Shingle buildings in Henderson often carry metal or low-slope sections too.

Metal fellowship halls, shops, and additions beside a shingle roof take a metal coating over sealed screws and laps.
Commercial metal roof coatingFlat porches and canopies that hold water get silicone, kept separate from the shingle coating.
Silicone for porches and canopies
Pitched metal additions that drain well can take a white acrylic that recoats easily.
Acrylic for pitched metal additionsAnswers for owners of commercial shingle roofs deciding between a coating and a re-roof.
Sometimes, when the shingles are intact and the coating maker approves its product over shingles. Curling, missing, or brittle shingles rule it out, exposed mat needs repair first, and shingle manufacturer terms can be affected. Many tired shingle roofs are better off re-roofed, while metal additions can still be coated.
Inspection and repairs take most of the time, and the coating itself goes on quickly once tabs and flashing are fixed. Weather, roof size, and how much flashing needs redoing set the schedule, which we give you after the roof walk.
Roof access details, leak history, and past repair records. Photos of ceiling stains, dates of hail or wind, and plans for new rooftop units or skylight panels help too, along with the building’s hours and loading dock schedule. On a shingle building, mention any re-roof bids already in hand.
Upkeep means a yearly look at the valleys, flashing, and edges, plus clearing gutters so water leaves the roof. Loose tabs found later get secured and spot-coated. Any recoat uses a product the maker approves over its own earlier coat.
Yes. Crews work outside on the roof, and the main disruptions are ladders at the walls and limited parking near the building. We set work hours around services, events, or office schedules and keep entrances clear during those times.
Metal additions get a metal roof coating over tightened or replaced screws and sealed laps, often in the same visit as the shingle work. The joint between the two roofs gets fabric and coating so both sides meet without a gap at the wall.
Schedule an inspection, or call us with the building type and what you are seeing on the roof.
Leave a name and number and we will call about your roof.
Or call now: (270) 236-5481